Lemoon's Painting CSLB #1120008

What Decides the Cost to Paint a House

By Lemoon's Painting Updated

The cost of painting a house in San Diego is decided by the hours the work takes and how difficult the preparation is, not by square footage alone. Two homes the same size can differ by days of labor because one has sound stucco and the other has cracking, chalking and rotted trim. That is why an honest painter looks at your house before quoting.

The first question a San Diego painter hears is what it will cost. Here is the straight answer.

Lemoon’s Painting does not publish prices. Not on this page, not anywhere on this site. That is a deliberate decision: the number depends on your house, and anybody who quotes you before seeing it is either guessing or building in a cushion to cover the guess. The estimate is free, so there is no cost to finding out the real number.

What follows is what that number is actually made of.

The six things that move the price

1. How much surface there is

Square footage is the starting point, but it is only the starting point. A single-story home with long wall runs and little trim is a different job from a two-story with the same footprint, six dormers and profiled molding on every window. Eaves, gates, garage doors, railings and fascia boards all count as surface, and they are slow surface, because they are cut in by hand.

2. How much preparation it needs

This is the big one, and it is where estimates diverge most. Washing, scraping, patching, sanding and priming can take longer than the painting itself. A wall that has chalked (that powdery film that comes off on your hand) will not hold new paint until the chalk is washed off. A hairline crack that is painted over rather than opened and filled tends to split open again along the same line.

The age of the house shows up here more than anywhere. Much of western Chula Vista is stucco built between the 1950s and the 1970s, and stucco of that age has usually moved; the crack repair is where the days go. Near the water in Imperial Beach, the extra time is a thorough freshwater wash to get salt off the walls and enough drying time before anything is coated.

3. How many coats

A big color change needs more coats than refreshing a wall in its existing color. So does bare or freshly repaired surface. Two coats over sound, similar-colored paint is a different job from three over patched stucco. A deep color going over a pale one, or a pale one going over a deep red, is the classic case of a job that needs an extra pass.

4. Height and access

Second stories, stairwells, steep lots and anything needing ladders or scaffolding take longer to set up safely. On a hillside lot in Spring Valley, staging can take a meaningful share of the day before a brush is opened. Close neighbors, tight side yards and dense planting against the walls also add masking and moving time.

5. What else is included

Stucco or drywall repair, wood staining, waterproofing or cabinets alongside the painting all change the shape of the job. Doing them together usually takes fewer days in total than separate visits, because the set-up and masking happen once.

6. The paint itself

Materials are a smaller share of a job than most people expect; labor dominates. That is exactly why cutting corners on paint is a poor trade. Lemoon’s Painting uses Dunn-Edwards and Sherwin-Williams, chosen for finish and durability. We don’t cheap out on quality.

Why does the same house get such different quotes?

Because each painter is quoting a different job. One has priced a wash, crack repair, spot-priming and two full coats; another has priced one coat over an unwashed wall. Both numbers describe “painting the house”, but only one describes the preparation that keeps the finish on the wall through San Diego sun.

How to compare two estimates fairly

A lower number is not automatically a better deal, and a higher number is not automatically thorough. Ask both painters the same four questions:

  1. What preparation is included? Get it specific: washing, crack repair, priming, which surfaces.
  2. How many coats, and of what? A named product and a coat count, not “two coats of good paint”.
  3. What is excluded? The honest answer to this tells you more than the price does.
  4. What happens if something is found mid-job? Rot behind trim, or stucco that sounds hollow. A good answer describes how you will be told and what the options are, before anything changes.

If one estimate is far below the others, look at what it leaves out. The gap is usually preparation, and preparation is the part that decides how long the finish lasts.

What Ebenezer does instead

He prices by the hours a job takes and how difficult the preparation is. He walks the property, shows you what he found, and explains the steps involved before you decide anything. A home takes somewhere between one and ten days, and where yours falls in that range is mostly a question of how much preparation it needs. If the scope changes once work starts, he tells you what the change involves and how it affects the job, and then the decision is yours.

Financing is available; ask about it at the estimate. You can read how a job runs on the process page and what exterior painting includes.

Want the real number for your house rather than a guess about somebody else’s? Ask for a free estimate and Ebenezer will walk your walls, tell you what he sees, and put it in writing.

Common questions

Why won't Lemoon's Painting publish a price list?

Because the number depends on your house. Ebenezer prices by the hours a job takes and how difficult the preparation is, and neither can be known without seeing the walls. Any figure printed before that would be a guess, and the estimate is free, so there is no cost to getting the real one.

Does square footage decide what a repaint costs?

It is the starting point, not the answer. Two homes with the same footprint can differ by days of work because of stories, trim detail, access and above all the condition of the surface. Cracked stucco, chalking and rotted fascia all add preparation hours that a square-foot figure never shows.

Why is preparation such a large part of the job?

Washing, crack repair, scraping, sanding and spot-priming often take longer than the painting itself, and they decide whether the finish lasts. Paint over chalk does not bond, and paint over an unrepaired crack tends to split open again. A thorough painter spends the hours there because that is where a repaint succeeds or fails.

How should I compare two painting estimates?

Ask both painters the same questions: what preparation is included, how many coats of which product, what is excluded, and what happens if something is found mid-job. When one estimate is far below the others, the gap is usually preparation that has been left out, and that is the part you would notice in a few years.

Keep reading

Want Ebenezer to look at your project?

The estimate is free. He will listen to what you want and explain the steps.