Lemoon's Painting CSLB #1120008

Reading a Painting Estimate Line by Line

By Lemoon's Painting

A good painting estimate reads like a plan, not a price tag. It names every surface by room or elevation, lists the preparation steps, states the maker, product, sheen and number of coats, and says plainly what is excluded. If a line could mean two different things, ask for it to be rewritten before you sign; that is where most disputes begin.

Most homeowners read an estimate from the bottom up: they find the number, then skim the rest. That is understandable and it is backwards. The number only means something once you know what it describes, and the description is in the lines above it.

This is a walk through a written painting estimate in the order the sections usually appear, with what each one should say and what a vague version looks like. It is the document you will hold the job against, so it deserves ten careful minutes.

The header: who, where and when

The top of the estimate should carry the contractor’s business name, the license number and classification (for painting, C-33), a way to reach the person responsible, the date, and the property it refers to. It should also say how long the estimate stands. Paint and scheduling change, and a date on the document avoids an argument about which version applies.

If the license number is missing, that is the first question to ask, before any of the rest. Ebenezer’s is CSLB 1120008, C-33, issued to Lemoon’s Painting Inc.

The scope: every surface, named

The scope is a list of what will be painted, and good scopes are boringly thorough. Outside, that means walls by elevation or as “all stucco body”, then each trim item separately: fascia, eaves, window and door trim, garage door, entry door, gates, railings, pop-outs. Inside, it means rooms by name, and within each room whether ceilings, walls, baseboards, door frames, doors and closets are included.

Vague scope sounds like “paint exterior of house” or “interior repaint”. Those phrases leave the garage door, the side gate and the inside of the closets to memory, and memories differ.

The preparation lines

This section is where estimates most often differ, and where a careful one earns its length. Preparation should be written as steps in the order they happen. On an exterior, for example:

  1. Power wash the surfaces to be painted.
  2. Check stucco and wood; open, fill and texture cracks; repair or flag soft wood.
  3. Spot-prime repairs and bare surfaces.
  4. Caulk where trim meets stucco and at gaps that move.
  5. Mask windows, floors, fixtures and anything staying clean.

On an older stucco home in El Cajon, where years of hard valley sun often chalk the south and west walls, the wash and the spot-priming are not optional extras. “Prep as needed” cannot be checked afterwards. A list of steps can.

Products, sheens and coats

A clear estimate names the maker and the product line for each kind of surface, the sheen, and the number of coats. Stucco body, wood trim and doors often get different products and different sheens, and they should be listed that way. Ebenezer uses Dunn-Edwards and Sherwin-Williams, chosen for quality and finish. He prefers to supply the paint himself, and you can ask which product he proposes for each surface.

Watch for “two coats” written once at the bottom and meant to cover everything. Ask whether it means two coats on the body and trim alike, and whether repaired areas get primer first.

The colors

Colors are often finalised after the estimate, which is fine, but the estimate should say how many colors are included and where each goes: body, trim, accent, door. In HOA communities such as Eastlake and Otay Ranch, the colors usually come from an approved palette and need committee approval before work begins. The estimate can note that the start date follows the approval.

What a vague line looks like, and the clearer version

VagueClearer
Paint exteriorAll stucco body, fascia, eaves, window and door trim; garage door and side gate included
Prep as neededPower wash; open, fill and texture cracks; spot-prime repairs; caulk trim joints
Premium paintNamed maker and product line, sheen for each surface
Two coatsTwo finish coats on body and trim; primer on repairs and bare wood
Clean up afterMasking removed, debris hauled, surfaces left as found

Exclusions: where the job stops

Read this section twice. It should list the things a reasonable person might assume are included but are not: the inside of the garage, the block wall at the property line, the patio cover, the shed, interior window frames, fixing wood rot found behind trim. An estimate with no exclusions has not thought about its edges. Clear boundaries protect both sides, and Ebenezer sticks to them.

Schedule, payment and changes

The estimate should give a working duration, not a promise to the hour. A home typically takes between one and ten days, depending mostly on preparation. It should describe how payment works, and if you are interested in financing, ask about it then; Lemoon’s Painting offers it. Finally, it should say what happens if the scope changes: you should be told the steps the change involves and how it affects the cost before the work goes ahead.

Before you sign

Mark every line you would not be able to check when the job is done, and ask for it to be reworded. Then compare the estimate against the contractor questions and the process page, and see whether they agree with each other.

If you would like an estimate that can stand up to this kind of reading, ask Ebenezer for a free estimate. He looks at the property first and will go through what is included with you. More on what exterior painting includes is here.

Common questions

What is the most important line on a painting estimate?

The exclusions. Everything else describes what you are getting; the exclusions tell you where the job stops. If an estimate has no exclusions at all, it is not because everything is included. It usually means nobody has thought about the edges of the job, and those edges are where surprises happen later.

Should a painting estimate name the paint product?

Yes, by maker and product line, with the sheen for each surface. 'Premium exterior paint' could describe almost anything. A named product lets you look up what it is designed for, and it lets you compare two estimates honestly. Lemoon's Painting uses Dunn-Edwards and Sherwin-Williams; ask which product goes on each surface.

How specific should the preparation section be?

Specific enough that you could check it was done. 'Prep as needed' cannot be checked. 'Power wash all stucco and trim, open and fill cracks at window corners, re-texture and spot-prime repairs' can. On older stucco or weathered wood, preparation is most of the work, so it deserves most of the words.

What should I do if a line on the estimate is unclear?

Ask, and ask for the answer in writing on the estimate itself. A verbal clarification gets remembered two different ways a month later. A careful contractor will not mind rewording a line, because a precise estimate protects him as much as it protects you.