Lemoon's Painting CSLB #1120008

What a Low Painting Bid Leaves Out

By Lemoon's Painting

A low painting bid is usually low because work has been left out, not because the painter is more efficient. The usual omissions are a thorough wash, crack and wood repair, primer on repairs, a second full coat, caulking and careful masking. Each one saves hours on the job and shows up later as peeling, returning cracks, patchy sheen or paint on the windows.

When three painting bids come back and one sits well below the other two, the natural thought is that the low one is efficient, or hungry for work, or carries lower overhead. Occasionally that is true. Much more often the low bid describes a smaller job, and the difference is hours of work that the other two painters planned to do and this one did not.

The trouble is that the missing work is invisible on the day the job ends. A freshly painted house looks good whatever went on underneath. Here is what usually gets left out, and when each omission tends to show itself.

Why is one bid so much lower than the others?

Because painting is priced by the hours a job takes, and the hours that come out first are the ones you never see: washing, repair, primer, a second coat and careful masking. Take those out and the visible work, the color going on the wall, takes a fraction of the time. The bid falls accordingly, and so does how long the finish lasts.

The wash, shortened or skipped

A thorough wash is the first thing to shrink. On an older San Diego wall it removes dirt, salt near the coast, mildew on the shaded side and, above all, chalk: the powdery, oxidised binder that forms on sun-facing paint over the years. Paint applied over chalk is sticking to dust. It looks fine at first, then begins to lift in sheets, and the failure spreads because none of it was ever properly attached.

A token rinse is not the same thing. Neither is washing in the morning and painting the same afternoon, before the stucco has dried out.

Crack repair, replaced with paint

Hairline cracks at window and door corners are normal on the post-war stucco common in National City and across the South Bay. Done properly, each is opened, filled, textured to match and primed. Left out of a low bid, the crack is painted over and nothing more. Paint bridges it for a few months. Then the wall moves through a season of warm days and cool nights, and the crack reappears exactly where it was.

Wood repair, deferred

Soft fascia, a rotted window sill or a split gate rail takes time to cut out and repair. The low bid often paints over it, which seals moisture into wood that is already failing. The paint looks fresh for a while, then blisters and splits along the grain.

Primer on repairs and bare spots

Every patch, every scraped area and every bare piece of wood absorbs paint differently from the wall around it. Without spot-priming, those areas show through the finish as duller or shinier patches, a defect painters call flashing. It is most visible when low afternoon sun crosses the wall, and once it is there the only cure is another coat.

The second coat

A coat count is the most tempting saving of all. One heavy coat can look even on the day, but it is thinner than two, it covers a color change less evenly, and it gives the surface less protection against sun and weather. On a big color change, even two coats may not be enough.

Caulking, masking and the surfaces nobody looks at

Caulking where trim meets stucco keeps water out of the joint; skipping it saves an hour and invites rot. Masking is slow, careful work, and skimped masking shows up as paint on windows, light fixtures, roof tiles, walkways and sometimes the neighbor’s car. And the surfaces not visible from the street (the undersides of eaves, the wall behind the shrubs, the back of the garage) are where missed spots and thin coverage hide.

On East County properties such as those in Santee, the fences, patio covers and gates are often left out of the bid entirely, and the homeowner only notices when the house looks new and the yard does not.

The product swapped down

Two bids can both say “exterior paint” while describing very different products. A low bid sometimes assumes an entry-level line where the others assumed a premium one. Ask for the maker and the product line in writing. Ebenezer uses Dunn-Edwards and Sherwin-Williams, and he will tell you which product he proposes for each surface. We don’t cheap out on quality.

How to find out what a low bid leaves out

  1. Put the bids side by side and list each preparation step, product and coat count in a column.
  2. Circle every blank in the low bid’s column.
  3. Ask the low bidder whether each circled item is included, and to write the answer on the bid.
  4. Ask what happens if rot or hollow stucco is found once work starts.
  5. Compare again. If the number rises to match the others, you now know what it was missing.

There is a fuller guide to reading a painting estimate line by line, and a list of red flags when hiring a painter.

The bid that lasts

Ebenezer prices by the hours a job takes and how difficult the preparation is, which is why he talks through the preparation the job needs rather than hiding it. Exterior work follows the same order every time: power wash, check the stucco and wood for repairs, mask the windows and floors, then paint. You can read about exterior painting and the guarantee before you decide.

If you are holding a low bid and wondering what it is missing, ask for a free estimate. Ebenezer will walk the walls, show you what he finds and explain the steps, so you can compare like with like.

Common questions

Is a low painting bid always a bad choice?

Not always. Sometimes a house genuinely needs less preparation than another painter assumed, or the bidder misunderstood the scope in your favor. The point is to find out why it is low. Ask the low bidder to confirm, in writing, the same prep steps, products and coats the other bids list, and see whether the number holds.

What does flashing mean on a painted wall?

Flashing is a patchy look where repaired or bare spots show through the finish as duller or shinier areas, most visible in low sun. It happens when patches are not primed before the finish coats, because the patch absorbs paint differently from the wall around it. It is one of the first signs that primer was skipped.

How soon do skipped steps show up after a repaint?

Masking and missed spots show the day the job ends. Flashing over unprimed patches shows in the first low afternoon sun. Hairline cracks painted over often reappear after a season of temperature swings. Peeling over an unwashed, chalky wall can take a little longer, but once it starts it spreads, because the paint was never properly attached.

How can I tell if a bid includes a second coat?

Look for the coat count written for each surface, not once at the bottom. Then ask directly whether it means two full finish coats on body and trim alike, and whether repairs get primer first. A painter who plans two coats will say so without hesitation; one who plans one heavy coat may describe it as 'full coverage'.

Keep reading

Want Ebenezer to look at your project?

The estimate is free. He will listen to what you want and explain the steps.