Lemoon's Painting CSLB #1120008

Painting a Retail Storefront

By Lemoon's Painting

A storefront repaint is judged from the sidewalk, so the details customers see up close decide whether it looks professional: clean lines at the glass, a sign band that is not streaked, metal frames and doors primed for metal, and a brand color chosen knowing that strong reds and yellows are the first to fade in afternoon sun. Check the landlord's design rules before choosing anything.

The front of a shop does a job no other wall does. Customers decide whether to walk in before they have seen a single product, and a faded sign band or a peeling door frame tells them something about the business, fairly or not. That is why a storefront repaint is not just an exterior repaint on a smaller wall. It is the most visible few hundred square feet you own or lease.

Who decides the color?

On a stand-alone building, you do. In most strip centers and leased storefronts, the landlord or the center’s design rules have a say first, sometimes over body color, accent color and even the color of the door. Read your lease, ask the property manager for the exterior criteria, and get the approval in writing before you pick anything. A front painted in a color the center did not approve gets repainted, and the second time is not optional.

Brand colors and the San Diego sun

Most businesses want their front to carry the brand. That is a good instinct with one catch: the colors brands love (strong reds, bright yellows, saturated oranges and blues) are the colors that lose depth soonest in direct sun. A west-facing front on a commercial strip in El Cajon, where afternoon heat and UV are about as hard as the county gets, will show fading on a deep red long before it shows it on a warm neutral.

That does not mean giving up the brand color. It means a few deliberate choices:

  • Use the strongest color on the parts that matter most: the sign band, the door, an accent panel, rather than the whole elevation.
  • Ask for the color in a quality exterior line. Both Dunn-Edwards and Sherwin-Williams make premium exterior lines built to hold color longer in UV; the label tells you what each one is for.
  • Accept that the strong accent will want a refresh sooner than the body, and plan for it.
  • Paint a sample on the actual wall and look at it at ten in the morning and four in the afternoon. A color matched to a logo on a screen almost never looks the same across twenty feet of stucco in daylight.

The surfaces on a storefront

A shop front is usually several materials side by side, and each needs its own preparation.

Stucco or plaster body and parapet. Washed, checked for hairline cracks around openings and at the parapet cap, repaired, spot-primed and painted, the same as any stucco wall. The parapet top is worth a look: water that sits there finds its way down behind the finish.

The sign band. Often the dirtiest strip on the building, because it collects dust and runoff from the roofline. It is also the strip everyone looks at. It gets a thorough wash and careful cutting-in around the sign itself.

Metal storefront frames and doors. Aluminum frames, steel service doors, hollow-metal door frames and railings do not take paint the way masonry does. Each is cleaned of grease, abraded, and primed with a primer made for that metal before the finish coat. Painting metal without that step is how you end up with a door frame peeling within a season. On the coastal side of National City and near the bayfront, any rust on steel is treated first, because salt-driven rust bleeds straight through new paint.

Glass. Not painted, obviously, but it decides how the job looks. Clean, straight lines where frame meets glass are the difference between a front that looks professionally done and one that looks touched up.

The kick zone. The bottom three feet or so of a storefront takes shoes, carts, mop water and sidewalk splash. A harder-wearing, more washable sheen there, often a step glossier than the wall above, makes it much easier for your staff to keep clean.

Sheen: why storefronts are rarely flat

Flat finishes hide surface flaws, which is useful on a large stucco wall. But a flat finish also holds dirt and is harder to wash, which matters on a front that sees foot traffic and exhaust from the street. Many storefronts end up with a low-sheen finish on the body and a satin or semi-gloss on doors, frames and the kick zone. The choice is made per surface, not per building.

The order of the work

Storefront work is planned around opening hours, because the one place customers must be able to reach is the door you are painting. The sequence usually runs:

  1. Power wash the front, ideally before opening or after closing, and give it time to dry, often until the next day.
  2. Check the stucco, parapet and metal and make any repairs.
  3. Mask glass, signage, lighting, the sidewalk and anything that is not being painted.
  4. Prime repairs and bare metal.
  5. Paint the body and sign band, then the doors and frames last, in the window when the door can be propped or the other entrance used.
  6. Remove masking, clean up, and walk the front with you.

The detail of keeping customers moving through a working shop while this happens is its own subject, covered in painting while your business stays open.

The sign stays a sign company’s job

Removing a sign, especially an illuminated one, is electrical and sign work, not painting. There are two good options: paint carefully around it, or coordinate with your sign company so the wall behind it is painted in the window when the sign is down. Ebenezer tells you which makes sense at the estimate, so you are not left with a clean wall and an outline of the old paint once the sign moves.

Keep the color on file

When the job is done, you should have the exact color names, product lines and sheens written down for every surface. Scuffs, a new sign mounted in a different place or a graffiti tag can then be touched up with the right paint instead of a near match that shows.

If the front of your shop no longer looks like the business inside it, ask for a free estimate. Ebenezer, who holds C-33 license 1120008, issued to Lemoon’s Painting Inc, and manages every commercial painting project personally, will look at it from the sidewalk the way your customers do, then up close, and tell you plainly what it needs. That applies whether your shop is in National City, El Cajon or anywhere in San Diego, and whether it is one door wide or a whole center.

Common questions

Can you match my brand color exactly?

A paint color can be matched closely to a brand sample, but what you see on screen or on a printed logo will never read the same as a large painted wall in daylight. The right way is a sample patch on the actual wall, looked at in morning and afternoon light, before the full color is committed.

Can the aluminum window frames be painted?

Often they can, but metal does not hold paint the way stucco does. It has to be cleaned of oils, abraded and primed with a product made for that metal before any finish goes on. If the landlord's rules require the original finish, the frames are masked and left alone.

Do I need my landlord's permission to repaint the front?

In most shopping centers and leased buildings, yes. Many leases and center design rules control exterior colors, sometimes down to the trim. Get the approval in writing first, because repainting a front that was not approved means paying for it twice.

Will you take my sign down?

Removing and reinstalling a sign is work for a sign company, especially if it is lit. Ebenezer paints around it with careful masking, or schedules the wall behind it for the window when your sign company has it down, and says which it will be at the estimate.

Keep reading

Want Ebenezer to look at your project?

The estimate is free. He will listen to what you want and explain the steps.